Skip to content

2027 rates

Estimate your project

Choose what you need, one service or several. Each has its own price and can be hired separately. You will get a range, VAT included, and a delivery time.

Not sure what to ask for?

Answer three questions and we will build the selection for you.

What do you have today?

What do you want to achieve?

How big is it?

Or choose a package

Full package: 8% off its services.

01 What do you need?

Tap each service you want priced. You can choose just one.

BIM model

  • Priced per built square meter, per part of the building and by level of detail.

    Which parts of the building?

    How much detail? (LOD)

    LOD 300 @kamonandco
    Façade-to-slab junction · conceptual detail modeled in Revit. Drag to orbit; tap an element to see its data.

    If you are unsure, leave LOD 300: we will confirm it with you.

Images and video

  • Priced per image. It does not depend on area.

  • Priced per image. It does not depend on area.

  • Priced per second. It does not depend on area.

Design and drawings

  • Priced per built square meter, according to the scope you choose.

  • Priced per built square meter.

  • Priced per sheet. It does not depend on area.

    Identical floors or units are drawn once: count only the distinct sheets.

  • Priced per sheet. It does not depend on area.

    Identical floors or units are drawn once: count only the distinct sheets.

  • Priced per built square meter.

    Every existing unit is measured on site, even if it matches another: the full area is charged here.

Quantities, costs and construction

  • Priced per built square meter.

  • Priced per built square meter and per modeled system (at least one).

  • Priced per built square meter.

  • A base fee plus each schedule activity.

    If several floors repeat the same sequence, count their activities once per typical floor and the rest as scheduled.

  • Priced per built square meter and per round.

    48% of rework on site stems from poor project data and miscommunication. Source: Autodesk and FMI, Construction Disconnected (2018), a survey of 599 U.S. construction leaders.

Land and permits

  • Fixed price by lot size. It does not depend on built area.

  • A base fee plus each resulting lot or unit.

  • Priced per built square meter.

    Every existing unit is measured on site, even if it matches another: the full area is charged here.

@kamonandco
Estimate—