Skip to content
Night aerial view of land on the edge of an Antioquian town: three adjacent plots outlined by boundary lines of white light, their internal divisions dashed and a warm lantern on one corner marker.

Lot merger and subdivision technical documentation

Reconfiguring a property takes precise technical documentation that accurately represents the new layout of the land and supports the corresponding planning procedures.

Request a consultation
@kamonandco

Merging or subdividing properties

The new layout of the land, precisely documented

At KAMON & CO. we prepare the technical documentation for lot mergers and subdivisions (englobe and desenglobe), producing drawings, area schedules and graphic representation based on the information provided by the client. These processes consolidate several properties into a single lot or divide a plot into new independent units, supporting development projects, sales, urbanization, permitting or land management. Properly prepared technical documentation reduces inconsistencies and makes the process with the competent authorities easier.

Illustrative exercise

Boundaries that merge and divide

Three neighboring properties are merged into a single lot, and that lot is subdivided into four. At every step the area schedule closes: the total does not change, the shape of the properties does. Illustrative dimensions and areas.

PUBLIC STREET A 416 m² 16 m B 364 m² 14 m C 468 m² 18 m Merged lot 1,248 m² 48 m 1 338 m² 13 m 2 286 m² 11 m 3 312 m² 12 m 4 312 m² 12 m
FrontageArea
Property A16 m416 m²
Property B14 m364 m²
Property C18 m468 m²
Area check1,248 m²
FrontageArea
Merged lot48 m1,248 m²
Area check1,248 m²
FrontageArea
Lot 113 m338 m²
Lot 211 m286 m²
Lot 312 m312 m²
Lot 412 m312 m²
Area check1,248 m²

Illustrative · 26 m depth on every property.

Scope

What does the service include?

  1. 01

    Review

    • Review of the documentation provided
    • Preliminary analysis of the available information
  2. 02

    Representation

    • Graphic representation of boundaries
    • Identification of the resulting new lots
  3. 03

    Areas

    • Area schedules
  4. 04

    Supporting documents

    • Digital files for documentary support
    • BIM-compatible when required

6

Components of the technical documentation, from reviewing the information provided to the digital files that support the procedure.

Advantages

Why document your property with ?

  • Clear documentation

    Clear, organized technical documentation that accurately represents the new layout of the property.

  • Fewer errors

    Drawings prepared to high precision standards that reduce errors in the graphic documentation.

  • Smoother procedures

    Information organized to make planning procedures easier to prepare.

  • BIM-ready

    Integration with BIM workflows and information ready for the later stages of the project.

  • Close support

    Personal attention throughout the service and remote work nationwide when the scope allows.

Applications

Who is it for?

  1. 01Engineers
  2. 02Architects
  3. 03Contractors
  4. 04Property owners
  5. 05Planning consultants
  6. 06Real estate developers
  7. 07Real estate companies
  8. 08Public and private organizations

Process

Our methodology

  1. Step 01Documents
  2. Step 02Review
  3. Step 03Boundaries
  4. Step 04Resulting lots
  5. Step 05Area schedule
  6. Step 06Quality control
  7. Step 07Digital delivery

Frequently asked questions

What is the difference between a merger and a subdivision?

A merger (englobe) joins two or more properties into a single lot, while a subdivision (desenglobe) divides a property into two or more independent lots.

When is a lot merger used?

A merger is the technical integration of two or more independent properties into a single lot. It is common in real estate developments, extensions, public facilities, industrial projects and urban planning processes.

When is a subdivision used?

A subdivision is the technical division of a property into two or more independent lots, in line with the applicable planning regulations. It is typically used for urbanization, partial land sales, inheritances, real estate developments or projects that need new legally independent lots.

Which documents do I need?

Ideally a georeferenced topographic survey, a cadastral or property plan, the public deed, the certificate of title (when applicable), available cadastral information, official coordinates if any, and any other information related to the project.

Do you carry out topographic surveys?

Not directly. If the project requires one, we can recommend or coordinate the service with specialist partners.

Can I hire the service before I have a topographic survey?

Yes, but the final technical documentation will normally require an up-to-date, reliable topographic survey.

Can you work with DWG or PDF files?

Yes, as long as the information provided is precise enough to produce the technical documentation.

Does the service include filing with the authorities?

No. KAMON & CO. prepares the technical documentation that supports the procedure. Filing, approval and registration are the responsibility of the competent authorities and entities.

How long does it take, and do you work outside Antioquia?

Yes, we work in other regions: when the available documentation allows, we provide the service remotely across Colombia. The timeline depends on the size of the property and the information available, or on the date the client needs: we assess the scope and confirm in the quote whether it can be met. We reply to every inquiry in under 24 business hours, and the formal quote takes 1 to 2 business weeks from the moment we receive the complete information.

What comes after the merger or subdivision?

Depending on the project, the next step may be a zoning analysis, architectural design, planning permits, BIM modeling or the technical development of the proposal.

@kamonandco